The bottom-plates of such cranes are massive more than enough Therefore the crane could be bolted on to a manufacturing facility concrete floor. All installation specifics has to be specified by a Professional Engineer. Our crew can make sure foundation-fewer jib cranes are properly and professionally set up and secured. https://tos-whn-1343949.blogpostie.com/53194454/getting-my-lifting-system-to-work