Bored piles are drilled into the ground employing a drilling device and they are well suited for soils with reduced bearing potential and substantial water desk. The dynamic load testing procedure begins Using the preparation from the drilled shaft, which includes installing needed instrumentation like pressure gauges and accelerometers. These https://targeted-by-coven54443.blogprodesign.com/53360013/pile-installation-services-bangladesh-options